For more information on the State Environmental Policy Act, contact Lisa Wood

(360) 902-2260
or
SEPAdesk@dfw.wa.gov

 

 

Final 2013 SEPA Documents

SEPA # Project County Signed Comment
Deadline
Status
13083 Land Exchange Involving WDFW Wenas Wildlife Area
See also:
- Final Environmental Assessment
- Washington Dept. of Transportation Comments
- Arvilla and Dennis Ohlde Comments
Kittitas and Yakima 01/09/2014 02/08/2014 FINAL
10 FEB 14
13082 FDNS Whiskey Dick Wildlife Area Seasonal Road Closure
See also:
- Checklist
- Summary of Comments
- Gregg Bafundo Comment
- Gloria and Jeb Baldi Comment
- Deborah Barrett Comment
- Janet Burcham Comment
- John Chappell Comment
- Allan Charlton Comment
- Jim Charlton Comment
- Win Charlton Comment
- Conservation Northwest Comment
- Lana Cruse Comment
- Gia Cummisk Comment
- W.R. Essman Comment
- Kay Forsythe Comment
- Warren Gimlin Comment
- Gordon Goodwin Comment
- Joe Greenhaw Comment
- Cindy Gutzwiler Comment
- Jerry Gutzwiler Comment
- Jerry Gutzwiler Comment
- Randy Hein Comment
- Rick Holstrom Comment
- Kittitas Audubon Comment
- Kittitas Co. Commissioners Comment
- Kittitas Field and Stream Club Comment
- David Knibb Comment
- Carmen Knoke Comment
- Gloria Lindstrom Comment
- Hal Lindstrom Comment
- Washington Native Plant Society Comment
- Washington Native Plant Society Questions
- Dennis and Arvilla Ohlde Comment
- Gerald and Joyce Pfluger Comment
- Karen Raymond Comment
- Sharon Rose Comment
- Laura Schiltz Comment
- Sierra Club Comment
- Bob Stokke Comment
- Herb Troxel Comment
- Wenatchee Sportmen's Association Comment
- Washington Dept. of Transportation Comment
Kittitas 12/23/2013 01/13/2014 FINAL
29 JAN 14
13081 Humptulips Hatchery Stevens Creek Intake
See also:
- Checklist
- Project Plans
- Department of Ecology comments
- WDFW Reply to Dept. of Ecology
Grays Harbor 12/12/2013 12/27/2013 FINAL
08 JAN 14
13080 Shario Grass Carp Plant
See also:
- Checklist
- Maps
- Grass Carp Stocking Application
King 11/26/2013 12/11/2013 FINAL
12 DEC 13
13079 Big Red Orchard Grass Carp
See also:
- Checklist
- Map
- Grass Carp Stocking Application
Franklin 11/26/2013 12/11/2013 FINAL
12 DEC 13
13078 Methow Wildlife Area Miller Harrison Bldg Demolition
See also:
- Checklist
- Maps
- Historic Inventory Report
- Washington Dept. of Ecology Comments
- WDFW reply to Dept. of Ecology
Okanogan 12/09/2013 12/24/2013 FINAL
30 DEC 13
13077 Pete Douglas Roll'em Ranch Grass Carp Plant
See also:
- Checklist
  11/15/2013 12/02/2013 FINAL
03 DEC 13
13076 Chinook Estuary Restoration Project
See also:
- Department of Ecology comments
- WDFW reply to Dept. of Ecology
- Department of Ecology additional comments
- WDFW Reply to Dept. of Ecology additional comments
Pacific 11/15/2013 12/02/2013 FINAL
03 DEC 13
13075 Marine Shoreline Design Guidelines
See also:
- Checklist
- Marine Shorelines Design Guidelines for Puget Sound - Kitsap Co. Comments; WDFW Reply
- Kitsap Co. Comment Form
- Pt. Townsend Comments
- WDFW Reply to Pt. Townsend
Puget Sound Counties 11/06/2013 11/21/2013 FINAL
22 NOV 13
13074 Soos Creek Hatchery Redevelopment
See also:
- Checklist
- Project Drawings
- Phase III Redevelopment Plan
- FINAL MSNS
- Ronald DeSilva Comment and WDFW Reply
- Dave Wetzel Comment and WDFW Reply
- Russell Carver Comment and WDFW Reply
- Rob Larsen Comment and WDFW Reply
King 10/28/2013 11/13/2013 FINAL
03 DEC 13
13073 WDFW Welts Property Wetland Restoration
See also:
- Checklist
- Map
- Site Plan
- Dept. of Ecology Comments
- WDFW Reply: Dept. of Ecolgy Response
- Dennis Clark Comments; WDFW Reply
- Tony Breckenridge Comments; WDFW Reply
- Dan Peck Comments; WDFW Reply
- Stormwater Projects Comments; WDFW Reply
- Jose Ramos Comments
- WDFW Reply to Jose Ramos
- Robert Pare Comments; WDFW Reply
- James Yount Comments; WDFW Reply
- Lea Lucky Comments; WDFW Reply
- Tom and Judy Sheahan Comments; WDFW Reply
- Samish River FAQ Sheet
- Property Survey
Skagit 10/22/2013 11/06/2013 FINAL
21 NOV 13
13072 HPA Rule Changes - Draft Programmatic EIS
See also:
- Cover Letter
- Fact Sheet
- Draft Hydraulic Code Rules Chapter 220-110 WAC
- Cross Walked Draft Hydraulic Code Rules
- Scoping Notice
Statewide 10/01/2013  Comments accepted between
10/01/13 - 12/19/13
CLOSED
20 DEC 13
13071 District 1 & 2 Lake Aerator Program
See also:
- Checklist
- Project Location
Stevens, Lincoln, Pend Oreille and Spokane 09/18/2013  10/03/2013 FINAL
7 OCT 13
13070 Swannack Bass & Bluegill Plant in Feustal Lk
See also:
- Checklist
- Photos
- Vicinity Map
- Comments by the Washington Department of Ecology
- WDFW Response to Washington Department of Ecology
Spokane 09/13/2013 09/30/2013 FINAL
1 OCT 13
13068 Invasive Cattail Control, Skagit Wildlife Area
See also:
- Checklist
- WA Dept. of Ecology Comments
- WDFW Reply to WA Dept. of Ecology
- Skagit River System Cooperative Comments
- WDFW Reply to Skagit River System Cooperative
Skagit 08/30/2013 09/16/2013 FINAL
14 OCT 13
13069 WDFW Similkameen – Chopaka WLA Enhancements: road, parking, access
See also:
- Checklist
Okanogan 09/10/2013  09/25/2013 FINAL
26 SEP 13
13066 Fazon Lake Outlet Beaver Dam Removal
See also:
- Checklist
- BorderLine Bassin Contenders Comments
- Fazon Lake Services Comments
- WDFW Reply to Gail and Bob Harriman
- Glenn and Jean Laird Comments
- WDFW Reply to the Lairds
- Bill and Kathy Hunter's Comments and WDFW reply
Whatcom 08/22/2013 09/06/2013 FINAL
9 SEP 13
13065 Parke Creek Fish Passage Barrier Removals
See also:
- Checklist
Kittitas 08/20/2013 09/05/2013 FINAL
9 SEP 13
13064 Cathlamet Channel Net Pens
See also:
- Checklist
- Department of Energy FONSI
- WDFW FDNS Cathlamet Channel Net Pens
- Washington State Dept. of Ecology Comments
- Lower Columbia Fish Recovery Board Comments
- Washington Coastal Conservation Association Comments
- Washington Coastal Conservation Association Test Fishery Summary
- Northwest Sports Fishing Industry Comments
- Gary Mueller Comments
- WDFW Response to Comments on Cathlamet Channel Net Pens
Wahkiakum 08/19/2013 09/04/2013 FINAL
15 OCT 13
13063 Winchester Orchard Pond Grass Carp
See also:
- Checklist
- Map
Grant 08/16/2013 09/03/2013 FINAL
4 SEP 13
13062 Chesaw Wildlife Area Aspen Burn
See also:
- Checklist
- Map
- Dept. of Ecology Comments
- WDFW Reply to Dept. of Ecology
- Project Maps
Okanogan 08/15/2013 08/30/2013 FINAL
2 SEP 13
13061 Addendum DNS 13039: Middle Crab Creek Habitat Enhancements and Recreational Trout Fishery
See also:
- SEPA Addendum
Grant 08/26/2013 No Comment Period. FINAL
26 AUG 13
13060 Caribou Creek Fish Passage Project
See also:
- Checklist
Kittitas 08/13/2013 08/28/2013 FINAL
29 AUG 13
13058 Frenchman Coulee Toilet
See also:
- Checklist
- Map
Grant 08/08/2013 08/23/2013 FINAL
26 AUG 13
13057 Taylor’s Checkerspot Butterfly Habitat Restoration
See also:
- Checklist
- Olympic National Forest Service Comments
Clallam 08/02/2013 08/19/2013 FINAL
19 AUG 13
13056 Legrow Water Irrigation Intake Maintenance
See also:
- Checklist
- Dept. of Ecology Comments
- Legrow Water Company Reply to Dept. of Ecology
Walla Walla 07/29/2013 08/12/2013 FINAL
13 AUG 13
13055 FEIS Addendum: Lake and Stream Rehabilitation 2013
See also:
- FSEIS 2002
- FSEIS 1992
- Statewide Map of Proposed Lake Rehabilitations
- Badger Lake Management Plan
- Badger Lake Pre-Rehabilitation Plan
- Badger Lake Map
- Pillar-Widgeon and Hampton Lakes Management Plan
- Pillar-Widgeon and Hampton Lakes
- Pillar-Widgeon and Hampton Lakes Map
- Spectacle Lake Management Plan
- Spectacle Lake Pre-Rehabilitation Plan
- Spectacle Lake Map
- Oroville Sportsmen Club President Comments
- Oroville Sportsmen Club Secretary-Treasurer Comments
- Oroville Sportsmen Club Board Member Comments, Pt. 1
- Oroville Sportsmen Club Board Member Comments, Pt. 2
- Oroville Sportsmen Club Board Member Comments, Pt. 3
- Oroville Sportsmen Club Board Member Comments, Pt. 4
- Oroville Sportsmen Club Member Comments, Pt. 1
- Oroville Sportsmen Club Member Comments, Pt. 2
- WDFW Reply to Oroville Sportsmen Club, President, Secretary-Treasurer, Board and Members
- Rick Lind Comments
- WDFW Reply to Rick Lind
- Terry Llewellyn Comments
- WDFW Reply to Terry Llewellyn
- Richard Smith Comments
- WDFW Reply to Richard Smith
- Okanogan Valley Bass Club Comments
Grant, Okanogan and Spokane 07/19/2013 08/09/2013 FINAL
14 AUG 13
13054 Modrow Fish Trap Enhancements
See also:
- Checklist
- Fish Trap Schematics
- Project Map and Modifications
- Project Overview and Mitigation
- Dept. of Ecology Comments
- WDFW Reply to Dept. of Ecology
Cowlitz 07/15/2013 07/30/2013 FINAL
22 AUG 13
13053 Bridgeport Boat Launch and Access Development
See also:
- Checklist
- Project Drawings
- Project Location Photos
- Dept. of Ecology Questions and Answers
Douglas 07/17/2013 07/29/2013 FINAL
30 JUL 13
13052 St. Helen Wildlife Area RMAP Road Closure
See also:
- Checklist
- Project Map Series 1
- Project Maps Series 2
- Project Maps Series 3
- Photo of Road Erosion
- Dept. of Ecology Comments
- WDFW Reply to Dept. of Ecology
Cowlitz 07/10/2013 07/25/2013 FINAL
29 JUL 13
13051 Thomas Grass Carp Plant
See also:
- Checklist
- Fish Stocking Application
- Project Location Maps
King 07/09/2013 07/24/2013 FINAL
25 JUL 13
13050 Skagit Wildlife Area Ditch Maintenance
See also:
- Checklist
- Project Summary and Maps
Skagit 07/03/2013 07/22/2013 FINAL
23 JUL 13
13048 Damon Point Streaked Horned Lark Habitat Enhancement
See also:
- Checklist
Grays Harbor 06/25/2013 07/11/2013 FINAL
12 JUL 13
13047 Kittitas Small Stream Spawning Enhancement
See also:
- Checklist
Kittitas 06/21/2013 07/08/2013 FINAL
09 JUL 13
13046 Reflection Lake Grass Carp Plant
See also:
- Stocking Plan
- Map
- ADDENDUM Reflection Lake Grass Carp
Spokane 06/11/2013 N/A Final No Comment FINAL
11 JUN 13
13045 Aberdeen Pipeline Project
See also:
- Checklist
- Project Location Maps
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Grays Harbor 06/11/2013 06/26/2013 FINAL
27 JUN 13
13044 Hamilton Grass Carp Plant
See also:
- Checklist
- Fish Stocking Application
- Project Location Maps
King 06/10/2013 06/25/2013 FINAL
25 JUN 13
13043 Kennedy Grass Carp Plant Private Ponds
See also:
- Checklist
- Fish Stocking Application
- Project Location Maps
- Tulalip Tribe's comments
- WDFW reply to Tulalip Tribe
King 06/10/2013 06/25/2013 FINAL
03 JUL 13
13042 Point Whitney Tide Gate Culvert Replacement and Dike Repair
See also:
- Checklist
- Map
- Dept. of Ecology Comments
- WDFW Reply to Dept. of Ecology
Jefferson 05/17/2013 05/31/2013 FINAL
03 JUN 13
13041 Catron Grass Carp Plant
See also:
- Checklist
- Map
- Application
Lewis 05/16/2013 05/31/2013 FINAL
03 JUN 13
13040 Baseline Lk Grass Carp Plant
See also:
- Checklist
- Map
Grant 05/15/2013 05/30/2013 FINAL
30 MAY 13
13039 Middle Crab Creek Habitat Enhancements and Recreational Trout Fishery
See also:
- Checklist
- Appendices
- WA St. Dept. of Transportation Comments
- WDFW Reply to WSDOT
Grant 04/29/2013 05/14/2013 FINAL
15 MAY 13
13037 Huckleberry Woods Sandy Lake Grass Carp Plant
See also:
- Checklist
- Project map
- Fish Planting Application
Mason 04/16/2013 05/01/2013 FINAL
02 MAY 13
13036 Beaver-Related Maintenance on WDFW Lands
See also:
- Checklist
- Yakama Nation Comments
- WDFW Reply to Yakama Nation
- Dept. of Ecology Comments
- WDFW Reply to Dept. of Ecology
Statewide 04/16/2013 05/01/2013 FINAL
06 MAY 13
13035 Parish Catfish Lake Grass Carp Plant
See also:
- Checklist
- Project map
- Fish Planting Application
Mason 04/15/2013 04/30/2013 FINAL
01 MAY 13
13034 Scotch Creek Pond and Creek Restoration
See also:
- Checklist
- Project map and drawings
Okanogan 04/11/2013 04/26/2013 FINAL
01 MAY 13
13033 Kalama Falls Hatchery Renovation
See also:
- Checklist
- Project map and drawings
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Cowlitz 04/02/2013 04/17/2013 FINAL
22 APR 13
13032 Reiter Ponds Hatchery Culvert Replacement
See also:
- Checklist
- Project map and drawings
Snohomish 03/26/2013 04/10/2013 FINAL
15 APR 13
13031 Cowlitz Wildlife Area Gate and Pullout at Kosmos Unit
See also:
- Checklist
- Project plan
- Project Schematic
Lewis 03/26/2013 04/10/2013 FINAL
12 APR 13
13030 Marblemount Hatchery Improvements
See also:
- Checklist
- Project location maps and drawings
- Hatchery Improvement Plan
Skagit 03/25/2013 04/09/2013 FINAL
10 APR 13
13029 Addendum - Humptulips Hatchery Improvements
See also:
- SEPA Checklist
Grays Harbor 03/22/2013 No Comment
Period
FINAL
22 MAR 13
13028 MDNS - Stillwater Snoqualmie R. Revetment Removal
See also:
- Checklist
- Project map
- Final Determination of Nonsignificance
- Doug Hennick, Watershed Steward Comments
King 04/02/2013 04/17/2013 FINAL
18 APR 13
13027 Voights Creek Hatchery Repair and Replacement - FEMA Public Notice
See also:
- DRAFT Environmental Assessment
- Dept. of Ecology Comments
- WDFW Reply to Dept. of Ecology
- Citizen Comment and WDFW Reply
- FINAL Environmental Assessment
- Finding of No Significant Impact (FONSI)
Pierce 03/12/2013 Comment Period Closed  FINAL
28 MAY 13
13026 Surfside Homeowners Grass Carp Plant - Ocean Park
See also:
- Checklist
- Project location maps
Pacific 03/07/2013 03/25/2013 FINAL
26 MAR 13
13025 Humptulips Hatchery Improvement Project
See also:
- SEPA Checklist
- Project drawings and pipeline map
- Project drawings and pond map
- ADDENDUM-Humptulips Hatchery Improvement Project
- SEPA ADDENDUM Checklist
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Grays Harbor 03/06/2013 03/21/2013 FINAL
22 MAR 13
13024 ADDENDUM - Voights Creek Hatchery Replacement
See also:
- SEPA Checklist
Pierce March 6, 2013 No Comment
Period
FINAL
06 MAR 13
13022 Sutherland Lake Public Access Improvements
See also:
- Checklist
- Project location maps
- Project drawings
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology comments
Clallam 03/05/2013 03/20/2013 FINAL
21 MAR 13
13021 Callero Artic Char Project
See also:
- Checklist
- Project Location map
- Aerial photo of project
Pierce 03/01/2013   No Comment
period
FINAL
01 MAR 13
13020 Yakima River Canyon Land Conversion and Mitigation Replacement Lands
See also:
- Environmental Assessment
- Environmental Assessment Appendix 1
- Environmental Assessment Appendix 2
- Project Map
- Project Figures: 1-5
- Citizen Comment
- Citizen Comment #2
- Final Determination of Non-significance and Environmental Assessment Adoption
Kittitas and Franklin 03/25/2013 05/22/2013 FINAL
28 MAY 13
13019 Addendum - WDFW Langsdorf Access Upgrade
See also:
- Revised Checklist
- Project map and drawings
Clark 02/25/2012 No Comment
period
FINAL
25 FEB 13
13018 Scatter Creek and West Rocky Vegetation Management
See also:
- Checklist
- Project location map
Thurston 02/21/2013 03/08/2013 FINAL
11 MAR 13
13017 WDFW Wooten Wildlife Area Tucannon River and Floodplain Restoration Projects
See also:
- Checklist
- Project location map
- 100 Percent Design Report
- Conceptual Restoration Plan Designs
- Conceptual Restoration Plan Chapter 3
- Conceptual Restoration Plan Chapter 4
- Conceptual Restoration Plan Chapter 9
- Construction drawings
Columbia 02/27/2013 03/14/2013 FINAL
15 MAR 13
13016 Kendall Cr. Hatchery Improvements
See also:
- Checklist
- Project location and drawings
Whatcom 02/13/2013 02/28/2013 FINAL
01 MAR 13
13015 Haven Lake Access Culvert Replacement
See also:
- Checklist
- Project drawings
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Mason 02/08/2013 02/25/2013 FINAL
26 FEB 13
13014 Addendum - Summit Lake Access Area Renovation
See also:
- SEPA Revised Checklist
- Project Drawings
Thurston 02/05/2013.  No Comment
Period
FINAL
05 FEB 13
13013 Methow Bridge 1 Access Project
See also:
- Checklist
- Project location and drawings
Okanogan 02/01/2013 02/18/2013 FINAL
26 FEB 13
13012 Three Crabs Restaurant Building Demolition
See also:
- Checklist
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Clallam 01/012013 02/18/2013 FINAL
22 FEB 13
13011 Wiley Slough Pump Station
See also:
- Checklist
- Project location and drawings
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Skagit 01/25/2013 02/11/2013 FINAL
12 FEB 13
13010 Lake Aberdeen Hatchery Pollution Abatement Pond
See also:
- Checklist
- Project drawings
- Letter from Dept. of Archeology and Historic Preservation
- City of Aberdeen comments
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Grays Harbor 01/24/2013 02/08/2013 FINAL
11 FEB 13
13009 North Bay Access Improvements
See also:
- Checklist
- Project drawings and location map
- Dept. of Archeaology and Historical Preservation comments
- WDFW reply to Dept. of Archeaology and Historical Preservation
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Mason 01/22/2013 02/06/2013 FINAL
08 FEB 13
13008 Voights Creek Hatchery Replacement
See also:
- Checklist
- Project drawings and location map
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Pierce 01/23/2013 02/07/2013 FINAL
06 MAR 13
13007 Lethal Control of Crow and Raven for Snowy Plover
See also:
- Checklist
- Vicinity maps
- Willapa Bay Audubon Society comments
- WDFW reply to Willapa Bay Audubon Society
Pacific and Grays Harbor 01/14/2013 01/29/2013 FINAL
30 JAN 13
13006 Luhr Creek Fish Passage and Stream Enhancement Project
See also:
- Checklist
- Project map and Drawings
- WA Dept. of Ecology Comments
- WDFW Reply to WA Dept. of Ecology
Pierce 01/11/2013 01/28/2013 FINAL
29 JAN 13
13005 Water Crossing Design Guidelines
See also:
- Checklist
- Water Crossing Design Guidelines [DRAFT]
- Yakima Nation comment to WDFW Water Crossing Guidelines
- WDFW Reply to Yakima Nation Comments
- Dept. of Transportation Comments
- WDFW Reply to Dept. of Tansportation
- WA Association of County Engineers Comments
- WDFW Reply to WSACE
- WDFW/WSACE Dispute Resolution Process
- Regional Roads Forum Comment
- WDFW Reply to Region Roads Forum
Statewide 01/21/2013 03/08/2013 FINAL
03 MAY 13
13004 ADDENDUM - Sherman Creek Wildlife Area Habitat Improvement Project
See also:
- Checklist
- Maps of Proposed Burns
Ferry 01/09/2013 No Comment
Period
FINAL
09 JAN 13
13003 Lake Sacheen Ramp and Access Area Renovation
See also:
- Checklist
- Project map and Drawings
- Pend Oreille County comments
- WDFW reply to Pend Oreille County
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Pend Oreille 01/04/2013 01/22/2013 FINAL
24 JAN 13
13002 Mc Allister Ck Hatchery Demolition
See also:
- Checklist
- Vicinity map
- Dept. of Ecology comments
- WDFW reply to Dept. of Ecology
Thurston 01/04/2013 01/22/2013 FINAL
23 JAN 13
13001 Tokul Ck Hatchery Diversion Dam and Fishway Replacement
See also:
- Checklist
- Project map and Drawings
- Wild Fish Conservancy comments
- WDFW reply to Wild Fish Conservancy
- Washington State Dept. of Transportation comments
- US Army Corps. of Engineers Analysis
- Snoqulamie Nation comments
- WDFW reply to Snoqualmie Nation
- Wild Steelhead Coalition comments
- WDFW reply to Wild Steelhead Coalition
King 01/04/2013 EXTENED TO
01/29/2013
FINAL
29 MAR 13
12087 Kenmore Access Area Improvements
See also:
- Checklist
- Project Drawings
- Muckleshoot Indian Tribe Fisheries Division Comments
- WDFW reply to Muckleshoot Indian Tribe Fisheries Division
King 12/11/2012 Comment Period Closed FINAL